Police headquarter of Saarland
 
photos | 1 | 2
 
location
Saarbrücken/ Saarland

architect
Hochstrasser.Neureuther, Neu-Ulm

construction volume
7 Mio EUR

year
2004 - 2005

material
reinforced concrete, steel, stonework

specifics
parts of building with different foundation depth
safety sections with high structural standards
basement with impermeable concrete as a “white basin”, sump drainage.

scope of work
Mike Sieder as project engineer of Schweitzer GmbH – consulting engineers:
project leader, structural design, static analysis in draft and detail planning, preparing construction plans.
  photos: VariCon
project: Copyright Schweitzer GmbH – All rights reserved