Membrane facade Green Point Stadium Capetown
 
photos | 1 | 2
 
location
Capetown/ South Africa

architekt
von Gerkan Marg und Partner, Berlin/ Germany; in cooperation with BKS, Capetown/ South Africa

project volume
14 Mio EUR

year
2008 - 2009

material
PTFE-membrane mesh, steel

specifics
- segmented anti-clastic mesh
- convex/ concave edges due to forming primary construction

scope of work
Mike Sieder as Head of Engineering of Hightex GmbH:
concept development, membrane analysis and construction design in cooperation with Tensys engineers, technical supervision of the planning
  photos: Copyright von GMP architekts All rights reserved
project: Copyright Hightex GmbH All rights reserved